Skip to Page Content

Water For Rivers

Current Projects

Layout
   

Channel Automation Central Goulburn Irrigation District - Victoria
Channel Automation Central Goulburn Irrigation District - Victoria The Central Goulburn Channel Automation Project (CG1234) aims to automate channels within the Central Goulburn Irrigation Area, south east of Tatura in Victoria's North. This project will continue to trial channel automation on Central Goulburn channels 1, 3 and 4 following the recently concluded two-year pilot on the CG2 channel.
More »


The Wah Wah Irrigation District Stock and Domestic System - NSW
 The project is the conversion of a small open channel delivery system which covers an extensive area supplying many dryland farmers, to a more efficient pipe system.
More »


Forrest Creek, Warriston Weir to Ryhola, NSW
Forrest Creek, Warriston Weir to Ryhola, NSW This project aims to reduce the amount of flow required over Warriston Weir through the provision of alternative stock and domestic water supply systems from Billabong Creek.
More »


Hay Private Irrigation District (PID) Pressurised Stock and Domestic Scheme, NSW
 This project will provide a pressurised pipeline for the supply for stock and domestic water as an alternate, more efficient supply for stock and domestic to 80 small farms across an area of 36 square kilometres situated 2km north of Hay, NSW.
More »


Improved Flow Measurement - Goulburn River Irrigation Areas, VIC
 This project involves the installation of accurate measurement devices at strategic locations (major off-takes and outfalls) throughout the four irrigation districts of the Goulburn System so that less efficient parts of the systems can be identified.
More »


Willow Removal
Willow Removal Removing willows from streams will produce measured water saving, as well as significantly improve stream efficiency.
More »


Yanco Creek Efficiency