Deniliquin Golf Club Water Efficiency Project

Ongoing drought conditions in the Riverina area of NSW has provided the catalyst for the Deniliquin Golf Club to seek investment in a more diverse and secure range of water sources from which to irrigate the course. » More

Mokoan Project - Victoria

Decommissioning Lake Mokoan will provide average annual water savings of 50,200 ML/year. » More

Channel Automation Central Goulburn Irrigation District - Victoria

The Central Goulburn Channel Automation Project (CG1234) aims to automate channels within the Central Goulburn Irrigation Area, south east of Tatura in Victoria's North. » More

Improved Flow Measurement - Goulburn River Irrigation Areas, VIC

This project involves the installation of accurate measurement devices at strategic locations (major off-takes and outfalls) throughout the four irrigation districts of the Goulburn System so that less efficient parts of the systems can be identified. » More

Hay Private Irrigation District (PID) Pressurised Stock and Domestic Scheme, NSW

The Hay PID is situated 2km north of Hay, covers an area of 36 square kilometres and supplies about 80 small farms. » More

Water Entitlement Purchase

Water for Rivers has completed purchases of general security water entitlements in the Murray and Murrumbidgee Rivers of NSW. » More

Edward River Wetlands, NSW

Installation of 27 regulators on anabranches to alleviate water logging within the Millewa and Gulpa Island State Forests and reduce evaporative water loss. » More

Coleambally Irrigation Area, NSW - Channel Automation

This project involved the installation of delivery technology in the southern half of the Coleambally Irrigation District. » More

Woorinen Pipeline - Pressurised Horticultural Irrigation Supply System - Victoria

The Woorinen Irrigation System supplied water through 33 kilometres of concrete lined channels and 20 kilometres of earthen channels to 200 properties. » More

Normanville Pipeline Project - Victoria

The project replaced 335km of open channels with 295 km of pipelines and delivers an estimated 400ML per year to 150 properties. » More

Improved Measurement of Small Volume Supplies in Irrigation Districts (IMSVSID) - Victoria

This project proposes to install meters on up to 1,200 of the 9,000 small pipe outlets in the Goulburn-Murray Irrigation District. » More

Alternate Water Supply - Forest Creek, NSW Stage 1

This project was developed to return water to the environment by reducing replenishment flows below Warriston Weir from 36.5 gigalitres to 25 gigalitres per annum. » More

Alternative Water Supply - Forest Creek, NSW Stage 2

Barren Box Swamp - NSW