- Completed Projects
- Bungunyah - Koraleigh Pipeline
- Coonancoocabill
- Deniliquin Golf Club Water Efficiency Project
- Mokoan Project - Victoria
- Channel Automation Central Goulburn Irrigation District - Victoria
- Improved Flow Measurement - Goulburn River Irrigation Areas, VIC
- Willow Removal
- Hay Private Irrigation District (PID) Pressurised Stock and Domestic Scheme, NSW
- Water Entitlement Purchase
- Edward River Wetlands, NSW
- Coleambally Irrigation Area, NSW - Channel Automation
- Woorinen Pipeline - Pressurised Horticultural Irrigation Supply System - Victoria
- Normanville Pipeline Project - Victoria
- Improved Measurement of Small Volume Supplies in Irrigation Districts (IMSVSID) - Victoria
- Alternate Water Supply - Forest Creek, NSW Stage 1
- Alternative Water Supply - Forest Creek, NSW Stage 2
- Barren Box Swamp - NSW
- Current Projects
Hay Private Irrigation District (PID) Pressurised Stock and Domestic Scheme, NSW
Water Saved 1,000 ML (1 GL)
Hay PID Conveyance Entitlement
The Hay PID is situated 2km north of Hay, covers an area of 36 square kilometres and supplies about 80 small farms with irrigation and stock and domestic water through a network of open channels.
The delivery of stock and domestic water through the open channel system in periods outside the irrigation season has proven to be highly inefficient. This project has provided a pressurised pipeline for the supply for stock and domestic water as an alternate, more efficient supply system. This means that the open channels can remain dry during the non-irrigation period.
The pipeline has also provided a secure stock and domestic supply system to the PID customers even in times of severe drought.
![]() | ||
