- Completed Projects
- Bungunyah - Koraleigh Pipeline
- Coonancoocabill
- Deniliquin Golf Club Water Efficiency Project
- Mokoan Project - Victoria
- Channel Automation Central Goulburn Irrigation District - Victoria
- Improved Flow Measurement - Goulburn River Irrigation Areas, VIC
- Willow Removal
- Hay Private Irrigation District (PID) Pressurised Stock and Domestic Scheme, NSW
- Water Entitlement Purchase
- Edward River Wetlands, NSW
- Coleambally Irrigation Area, NSW - Channel Automation
- Woorinen Pipeline - Pressurised Horticultural Irrigation Supply System - Victoria
- Normanville Pipeline Project - Victoria
- Improved Measurement of Small Volume Supplies in Irrigation Districts (IMSVSID) - Victoria
- Alternate Water Supply - Forest Creek, NSW Stage 1
- Alternative Water Supply - Forest Creek, NSW Stage 2
- Barren Box Swamp - NSW
- Current Projects
Alternate Water Supply - Forest Creek, NSW Stage 1
Water Saved 11,300 ML (11.3 GL)
NSW Murrumbidgee High Security Entitlement
The Forest Creek Stage 1 project was developed to return water to the environment by reducing replenishment flows below Warriston Weir from 36.5 gigalitres to 25 gigalitres, thus returning 11.5 gigalitres of water to the environment.
This system which was proposed by the landholders, involved providing alternative stock and domestic water supplies to landholders and returning an artificial stream to its original wetland state.
Benefits of this project:
- return Forest Creek below Rhyola to natural ephemeral stream flood flows
- positive environmental outcomes for habitat and sustainability
- improve the overall operational efficiency of the Billabong/Yanco Creek system while generating water savings