Ongoing drought conditions in the Riverina area of NSW has provided the catalyst for the Deniliquin Golf Club to seek investment in a more diverse and secure range of water sources from which to irrigate the course.
» More
Decommissioning Lake Mokoan will provide average annual water savings of 50,200 ML/year.
» More
This project involves the installation of accurate measurement devices at strategic locations (major off-takes and outfalls) throughout the four irrigation districts of the Goulburn System so that less efficient parts of the systems can be identified.
» More
The Hay PID is situated 2km north of Hay, covers an area of 36 square kilometres and supplies about 80 small farms.
» More
Water for Rivers has completed purchases of general security water entitlements in the Murray and Murrumbidgee Rivers of NSW.
» More
Installation of 27 regulators on anabranches to alleviate water logging within the Millewa and Gulpa Island State Forests and reduce evaporative water loss.
» More
This project involved the installation of delivery technology in the southern half of the Coleambally Irrigation District.
» More
The Woorinen Irrigation System supplied water through 33 kilometres of concrete lined channels and 20 kilometres of earthen channels to 200 properties.
» More
The project replaced 335km of open channels with 295 km of pipelines and delivers an estimated 400ML per year to 150 properties.
» More
This project proposes to install meters on up to 1,200 of the 9,000 small pipe outlets in the Goulburn-Murray Irrigation District.
» More
This project was developed to return water to the environment by reducing replenishment flows below Warriston Weir from 36.5 gigalitres to 25 gigalitres per annum.
» More
In the past the Forest Creek below Warriston Weir received water from Billabong Creek to supply stock and domestic water to adjoining landholdings, as well as wetland systems.
» More
Barren Box Swamp - NSW
